Automatic Folding Mask Making Machine

Short Description:

Model Number:HY200-02

price:USD70000/SET


Product Detail

Product Tags

Nonwoven 2D Folding Face Mask Making Machine

HTB13HTSs1uSBuNjy1Xcq6AYjFXax
HTB1ERX6hiQnBKNjSZFmq6AApsaaaVXab (1)
HTB1ERX6hiQnBKNjSZFmq6AApVXab (20)

1. PLC control.

 2. Photoelectric detection positioning.

 3. Add printing device.

 4. Tension control system.

 5. Good appearance and rustproof with aluminum alloy structure.

HTB1ERX6hiQnBKNjSZFmq6AApVXab (12)

It is a fully automatic production line to make foldable respiratory mask , which from nose wire welding, earloop welding to finished mask. It can be with extra function of ink-jet printer and pad printing system. It is available to reach the requirement of PM2.5 mask. It has a high automation  and stability with a high output and mostly reduce the cost by completing products at one time.

HTB1ERX6hiQnBKNjSZFmq6AApVXab (22)
Machine Size 7500*1050*1870mm
Output 40-45 pcs/min
Voltage 220 V/380V
Power 6.2 KW
Pressure 0.6 Mpa
Fuselage material Aluminium alloy
Special requirement Mask size need to be fixed
Note Stracking and auto box feeding is optional
Note Optional machine, waste collector is available
HTB1ERX6hiQnBKNjSZFmq6AApVXab (25)
HTB1ERX6hiQnBKNjSZFmq6AApVXab (26)
HTB1ERX6hiQnBKNjSZFmq6AApVXab (27)
HTB1ERX6hiQnBKNjSZFmq6AApVXab (29)
HTB1ERX6hiQnBKNjSZFmq6AApVXab (23)

1)    Provide 24-hour service hotline.
2)    Reply and find out solution within the shortest time according to customer’s requirement.
3)    Provide on call service to help customer solve problems.
4)    Provide free of machine installation as well as commissioning, and inform customer how to do the machine maintenance.
5)    Prepare customer’s feedback tracking within one week after machine installation until meet customer’s satisfaction.
6)    Provide one year guaranty and lifetime maintenance.

HTB1ERX6hiQnBKNjSZFmq6AApVXab (24)

1.     Q: How is the after sales service?
A:We provide 1 year guaranty and technical support lifetime. All machine’s parts can be replaced for free within 1 year if broken(excluding error operation).

 2.     Q: Is it difficult to install the machine?
A: The work shop should prepare full facility such as power and air compressor. For the first installation, engineer will be sent to set machine and do the machine training as long as manual instruction. For the further problems come out, we can provide video instruction as well.

 3.     Q: What’s the machine lead time?
A: For the standard machines, we can delivery within 30 days. If it is customized by customer(OEM), the lead time is 35-55 days.


  • Previous:
  • Next:

  • Write your message here and send it to us